Water Design-Build Council Blog

Bryan Bedell, DBIA, Haskell Water Division Leader

As the leader of Haskell’s Water Division, Bryan is responsible for project oversight, profit and loss, development of opportunities, strategic partnerships, and teaming. He oversees projects from inception through to completion while maintaining a high level of client interaction to ensure satisfaction with the project. As a design-builder with close to 20 years of experience in all aspects of project delivery, Bryan is able to bridge the needs and requirements of his clients, planners, design engineers, constructors and operators, ensuring that all stakeholders collaboratively develop excellent solutions. He serves as the First Vice President/Treasurer to the WDBC Board of Directors.

Recent Posts

Utilizing Design-Build Delivery to Provide Water Treatment Solutions on a Deadline

Posted by Bryan Bedell, DBIA, Haskell Water Division Leader on Fri, Jan 12, 2018 @ 11:00 AM

design-build-deliveryOwners often look to design-build delivery as a means to accelerate the overall schedule for their water or wastewater project. In fact, schedule advantage was cited as the #1 reason for selecting design-build delivery in a recent survey of owners conducted by the UNLV and Water Design-Build Council.

Read More

Topics: design-build

Haskell Spotlight: St. Marys Wastewater Treatment Plant Expansion

Posted by Bryan Bedell, DBIA, Haskell Water Division Leader on Fri, Aug 14, 2015 @ 01:07 PM

Located in the City of St. Mary’s, Georgia, the Point Peter Wastewater Treatment Plant was consistently experiencing flows of 1.2 mgd  and exceeded the capacity and 0.9 mgd discharge limits of its operating permit, primarily due to unanticipated development in the area.

Read More

Topics: Haskell, CMAR, Wastewater Treatment