Throughout the North America’s design-build industry, there are a number of project delivery models that are successfully used for the design, construction and operation of water and water reclamation facilities.
John Awezec, HDR Integrated Delivery Director, WDBC Board Member
Recent Posts
What is Construction Management At-Risk?
Posted by
John Awezec, HDR Integrated Delivery Director, WDBC Board Member on Wed, Jun 08, 2016 @ 04:46 PM
0 Comments Click here to read/write comments
Topics: CMAR