Water Design-Build Council Blog

Ken Slota, Construction Manager, PCL Construction

Ken Slota is a senior construction manager for PCL Construction’s Water Infrastructure Group. His background includes 20 years of both design and construction of infrastructure of water and wastewater treatment facilities. As a former consulting engineer, Ken has a unique perspective of the design process and the complexities of design-build projects.

Recent Posts

Allowances Versus Contingencies: What’s the Difference?

Posted by Ken Slota, Construction Manager, PCL Construction on Fri, Jun 15, 2018 @ 02:05 PM

Allowances and contingencies are often confused with one another, but understanding their differences is crucial to successfully executing project contracts.

Read More

Can Collaborative Delivery Be Good for Allocating Risk?

Posted by Ken Slota, Construction Manager, PCL Construction on Fri, May 26, 2017 @ 05:00 PM

For any business or organization (public or private) to be successful, risks must be proactively evaluated and addressed with mitigation plans. Risks, by their very nature, can sometimes produce undesirable consequences.

Read More

Topics: risk allocation