How Much Risk Should an Owner Transfer to a DB Firm on Their Project? 

One of the benefits of collaborative project delivery is that it allows owners to transfer risks to the design-builder that they would normally have to retain in a standard design-bid-build project delivery framework; however, owners should resist the temptation to divest themselves of all project risk and transfer everything to the design-builder.

Rather, owners should carefully weigh the cost/benefit of risk transference and develop a project risk allocation strategy.