Due to the complex nature of water projects, it is important to develop a project framework that allows flexibility and close collaboration between the owner and the project team. Progressive design-build lends itself particularly well to collaboration. In particular, using early design workshops that involve the design-build team, the owner, plant operators, and other stakeholders is a best practice that can pay dividends to the overall project.
Thomas Herer, P.E., Design-Build Engineer, AECOM