Longmont Wastewater Treatment Plant (CO)

Ammonia Treatment & Biosolids Dewatering Improvement Design-Build

Carollo Design-Build Group

Progressive Design-Build


Longmont2 (2)Working closely with the plant operations staff, the Carollo Design-Build Group engineered and constructed a solution that allowed the replacement of existing aeration and clarifiers with minimal disruption to the operation of the facility.

 

Download the Water Design-Build Council's project spotlight to learn more about this project, including: 

  • The impact of progressive design-build's flexibility
  • Significant cost savings on hauling biosolids away
  • How the wastewater plant stayed in operation during construction