Montevina Water Treatment Plant Improvements Project (CA)

San Jose Water Company

HDR, Inc. - Progressive Design-Build

 

Montevina WTP pumpsThe $50 million project started in 2014 and was completed in 2018. The progressive design-build approach met SJW’s expectations in terms of innovation, collaboration, and flexibility to adjust the scope of the project to meet a fixed budget. HDR and SJW worked together during the 12-month design phase to optimize the project scope by incorporating several innovative ideas into the project such as:

  • Conversion of the existing filters to plate settling basins
  • Utilizing an existing clearwell for temporary off-spec basin storage during construction
  • Incorporating a new administration building into the project

 

Download the Water Design-Build Council's project spotlight to learn more about this project, including: 

  • Why SJW chose progressive design-build
  • The many plant improvements that will allow SJW to treat water with raw water turbidity levels as high as 100 to 500 NTU during and following storm events

Learn more by downloading this project spotlight >>>