Member Login
WDBC Forum
Home
Contact Us
Become A Member
Member Login
About
Our Board
Committees and Projects
Industry Partners
Membership
Current Members
Become A Member
Member Benefits
WDBC Advisor Group
Corporate Messages
Projects
Testimonials
Knowledge Center
Educational Documents
Education Programs
Articles
Presentations & Videos
Legislation
Annual Reports
FAQ’s
Glossary
Research
News & Events
Newsletter
Events
Blog
Water Design-Build Council Blog
Closing the Gap with Design-Build for Water Infrastructure
Progressive Design-Build Delivery Provides Design and Construction Flexibility for the City of Clifton, Colorado
Happy Birthday, Spearin!
How Progressive Design-Build (PDB) Offered New Solutions to a Global Manufacturer and Saved Millions
Why Do Design-Build Projects Go Wrong?
Field Trips Aren't Just for Kids
Addressing the Craft Labor Shortage
Key Factors for a Successful Construction Management at-Risk (CMAR) Project: A Contractor’s Perspective
Design-Build Delivery Achieves Chronic Grit Accumulation Relief at Georgia’s Largest Wastewater Facility
Is Hiring a CMAR at the 30% Design Milestone Really a Best Practice? The Impact Timing has on Project Success
Does Collaborative Delivery Cost More?
What Decisions are Needed to Prepare Your Organization to Use Design-Build Delivery?
How Collaboration in a CMAR Project Successfully Delivered a Treatment Plant Expansion at UTRWD’s Riverbend Water Reclamation Plant
What are the Differences Between Collaborative and Design-Bid-Build Delivery?
Insights Into the Use of “Earned Performance Fees” in Design-Build Projects
Oh, the Benefits of Collaborative Startup and Commissioning
What’s Open-Book Pricing All About – How Does it Really Work?
How An Operations-Focused Collaborative Delivery Method Leads To A Successful Project
Allowances Versus Contingencies: What’s the Difference?
Early Supplier Involvement During The Development of the Response to a Design-Build RFP
How Treatability Testing and an Integrated Advanced Oxidation Treatment System Optimized Delivery Speed for a Water Treatment Plant Experiencing Harmful Algal Blooms
Flexibility is the Name of the Game in Collaborative Delivery
Can P3s Accelerate Puerto Rico’s Path to Recovery?
How An Integrated Design-Build Team Is Essential To Achieving Lowest Whole Of Life Cost In A P3 Project
Could You Pass a Quiz on Design-Build Terms?
How a Hybrid Procurement Approach was Successfully Used for an $800 Million Regional Wastewater Treatment Program
Who are the Champions for Design-Build and CMAR Projects – and What is Their Journey?
Utilizing CMAR to Create Efficiency Through the Value Engineering Process
Are You Really Ready to Create and Maintain a Collaborative Working Environment?
Design-Bid-Build (DBB) vs. Construction Management at-Risk (CMAR): Does Construction Management at-Risk (CMAR) Cost More?
Collaborative Delivery: Project Implementation Best Practices
Latest Technology Plus Progressive Design-Build Equals Win for Colorado’s Metro Wastewater Reclamation District’s Northern Treatment Plant
Common Questions (and Simple Answers) About Design-Build Delivery
How Can Education Address Impediments in Using Design-Build/CMAR Delivery for Water and Wastewater Projects?
Can Industry Partnerships and Private Financing Create Evolutionary Change in the Water Delivery Market?
What is the Importance of Well-Defined Acceptance Standards on Treatment Plant Design-Build Projects?
Managing Risks in Design-Build Delivery
Hidden Risk Topics in Construction Contracts – What You Don’t Know Can Hurt You
Construction Contract Risk Allocation – What You Don’t Know Can Hurt You
Utilizing Design-Build Delivery to Provide Water Treatment Solutions on a Deadline
Insights Into the Use of “Earned Performance Fees” in Design-Build Projects
Stephen R. Gates, PE, BCEE, Elected 2018 President of Water Design-Build Council Board of Directors
Understanding the differences in Guaranteed Maximum Price (GMP) and Fixed-Price for Design-Build Delivery Projects
WDBC Announces 2018 Officers
Giving Collaborative Delivery Advice to First-Time Water/Wastewater Owners
Early Supplier Involvement During The Development of the Response to a Design-Build RFP
Landmark Research Study Documents a Dramatic Increase in the Future Use of Design-Build Delivery for Water Infrastructure Projects – and Why It Is Preferred by Owners
Key Attributes of a Public-Private Partnership
What are the Differences Between Collaborative and Design-Bid-Build Delivery?
When A Collaborative Delivery Firm Establishes a Price, It Is a Binding Number
Are You Really Ready to Create and Maintain a Collaborative Working Environment?
The Benefit of Innovation in Collaborative Project Delivery
Does an Owner's Advisor Ever Assume the Role of a Construction Manager on a Design-Build Project?
What are the Benefits of Collaborative Delivery for Capital Program Projects?
Harnessing the Power of Collaboration on Progressive Design-Build Projects
Generating Team Collaboration in Construction Management at-Risk
Contingency – What is it? How is it set? And who owns it?
The Principles of Open-Book Pricing
A Collaborative Delivery Method with 2 Variations
Where do I get a contract to use for my design-build project – and what does this “off-ramp” mean?
How an Integrated Process System Optimized Delivery Speed and Value for a New Wastewater Treatment Plant
How Can Education Address Impediments in Using Design-Build/CMAR Delivery for Water and Wastewater Projects?
Understanding the differences in Guaranteed Maximum Price (GMP) and Fixed-Price for Design-Build Delivery Projects
Procurement Best Practices for Collaborative Delivery Projects
Managing Risks in Design-Build Delivery
What Stimulates Innovation in Design-Build Projects?
Guaranteed Maximum Price Determination on Progressive Design-Build Projects
Collaborative Delivery: Project Implementation Best Practices
Can Collaborative Delivery Be Good for Allocating Risk?
Giving Collaborative Delivery Advice to First-Time Water/Wastewater Owners
When A Collaborative Delivery Firm Establishes a Price, It Is a Binding Number
Smart Utilities Designed and Delivered Smartly
Design-Build and "Best Value" - What Does It Really Mean?
Collaboration is Growing the Water Design-Build Industry
What 5 Steps Should You Never Neglect in a Design-Build Delivery Project?
Reflecting on World Water Day: What’s Changed and What Needs to Change
Why Use Local Businesses in Collaborative Delivery Projects?
5 Key Factors for a Successful Water Infrastructure Public-Private Partnership Procurement
Closing the Design-Build Gap: A Focus on New York
Industry Perspective: The Value In Early Input from Operators and Equipment Suppliers in a Design-Build Project
Oh, the Benefits of Collaborative Startup and Commissioning
WDBC's Board of Directors welcomes Michael C. Loulakis, President of Captial Project Strategies, LLC, as an "At-Large Director"
How Do You Successfully Effectuate a Design-Build Project?
Generating Team Collaboration in Construction Management at-Risk
A Collaborative Delivery Method with 2 Variations
Design-Build and Moore’s Law
Consider Early Supplier Involvement (ESI) for Collaborative Project Delivery
Top Project Spotlights from 2016
Top Design-Build Insights from 2016
Top Construction Management at-Risk Insights from 2016
Top Collaborative Project Delivery Insights from 2016
Successful Collaborative Project Delivery in Atlanta
Use Lego for Your Next DB, PDB or CMAR Project
Collaborative Delivery: Project Implementation Best Practices
Collaborative Delivery: Contracts And Contracting Best Practices
What Is Construction Management-At-Risk (CMAR)?
Procurement Best Practices for Collaborative Delivery Projects
Interview: Insights for Industry Organizations Pursuing a Design-Build Project
Design-Build Project Delivery Gains Momentum as More Water Utilities Make the Switch
Risk and Reward in Cincinnati
Managing Risks in Design-Build Delivery
Optimizing Power and Control Solutions on Collaborative-Delivery Projects
What Are the Financial Trends of Municipalities in Funding Water and Sewer projects?
What Stimulates Innovation in Design-Build Projects?
The Principles of Open-Book Pricing
Design-Build in the Industrial Sector
How Much Risk Should an Owner Transfer to a DB Firm on Their Project?
The North Davis Sewer District Biosolids Progressive Design-Build Project
Design-Build Delivery: Not Just for 'Big' Water Projects
The Common Language between Utilities of the Future and Design-Build Delivery
Fixed-Price Design-Build Selection
Mitigating Risks Through Collaborative Delivery
Key Steps to a Successful Transition to Owner Operations
The Use of a Continuous, Real-Time Approach in Collaborative Projects
Safety in the Integrated Project Delivery Approach
What is Construction Management At-Risk?
Smart Partnerships Involve Equipment Suppliers in an Evolving Water Design-Build Industry
Innovative Approach to Remediation System Design Brings EPC to Industrial Client
What's So "Progressive" about Progressive Design-Build
We Can't Afford to Be Reactive About Water and Wastewater Issues
A Decade of Progress in Water Design-Build Delivery
"Can I Use Local Contractors in a Design-Build Project?"
WDBC Questions Foreign Time and Cost Performance of Design-Build Projects Study
What Are The Benefits Of Using Design-Build Delivery?
A Collaborative New Year’s Resolution for the Water Design-Build Council
The Claude "Bud" Lewis Carlsbad Desalination Facility: San Diego’s Water Portfolio Expands with Creative Thinking
Message from the 2015 President: A Year Of Industry Accomplishments Capstones A Decade Of Progress
How Do I Prepare My Organization To Use Design-Build Delivery?
How Does CMAR Differ from Design-Build?
Is Your Organization Considering Using Collaborative Delivery?
Turn-Key Design-Build SCADA - It Works!
From Parsons: Construction to Commissioning - Making the Transition a Smooth Process
The Most Valuable Assets Of Design-Build Projects
A Positive Future for Design-Build Delivery: A Black & Veatch Report
What is the Best Way to Procure a Design-Build Project?
How Much Control Should Owners and Managers Have in a Design-Build Project?
Haskell Spotlight: St. Marys Wastewater Treatment Plant Expansion
What's the Value of Water?
The Olathe Water Treatment Plant Expansion: Fixed-Price Design-Build
Defining the Role of Design-Build Delivery for Utility of the Future
What Are the Top 3 Success Factors in Collaborative Project Delivery?
Oppose Cuts to the Clean Water State Revolving Fund (CWSRF) Program
Design-Build-Operate: Recommended Best Practices
WDBC Seeks Information about Federal Design-Build Delivery Projects
Design-Build Delivery: Nitrogen Removal to Benefit the Chesapeake Bay
Progressive Design-Build Delivery Retrofits a Water Treatment Plant
Recommended Best Practices: Preparing for a Water Design-Build Project
Repairing Our Nation's Water Infrastructure: Dramatic Efforts Needed
Using Design-Build to Improve the Water System in Goodyear, Arizona
Balancing Risk Reduces Design-Build Project Cost & Scheduled Time
Covering the Risks in Design-Build: WDBC’s Response to ENR's Editorial
When Does Protecting the Owner's Best Interest Jeopardize the Project?
Project Spotlight: Arizona's Agua Nueva Water Reclamation Facility
Lend Your Voice: Push for Legislation to Repair Our Water Systems
Project Spotlight: Quincy, Washington Industrial Water Reuse Utility
Project Spotlight: Orlando Wastewater Treatment Discharge Project
Answering Questions about CMAR and Design-Build Delivery
Managing Design-Build Projects for Water Infrastructure
Enhancing Innovation through Design-Build
What Are the Benefits of Using Design-Build Delivery Methods for Water and Wastewater Industry Projects?
Castle Rock (CO) Water Supply Augmentation Project
Report Finds States' Use of Progressive Design-Build Has Doubled Since 2012
Allocation of Risk and Liability in a Design-Build or CMAR Project
Progressive Design-Build Procurement Selection Process
Project Spotlight: Charnock Well Field Restoration Project (California)
Project Spotlight: Longmont, Colorado, Water Treatment Plant
Producing a CMAR Project Management Plan
Project Spotlight: United Water New Jersey Water Treatment Facility
Guidelines for Conducting the Procurement Process
8 Questions to Ask When Choosing a Project-Delivery Method
Project Spotlight: Orlando, Florida, Wastewater Treatment Project
Project Spotlight: Carroll County, Maryland, Water Treatment Plant
Answering Questions about CMAR and Design-Build Delivery
Parsons Breaks Ground on CMAR Desalination Project
City of Annapolis Awards Design-Build Contract for Water Treatment
Procuring a Design-Build or Construction Management At-Risk Project
What Is A Construction Management at-Risk Project?
Demonstration Wetlands Treat and Reuse RO Concentrate
Municipalities Have Many Options in a Public-Private Partnership
Water Infrastructure - From Invisible to Invaluable
Moving from ‘Alternative Project Delivery’ to ‘Collaborative Delivery Solutions’
U.S. Congress Poised to Take Action on WIFIA
Value of Water Coalition launches Water Works! Campaign
Will Our Nation Learn the “Worth of water” Before the Well is Dry?
How Effective Membrane Bioreactor (MBR) Systems Remove Pathogens
Water Design-Build Council Announces New Leadership
Project Spotlight: Industrial Wastewater Treatment Plant Upgrade
Design-Build Project Delivers High-Quality Water for Dania Beach
New Tool Helps Water Utilities Implement Effective Utility Management
Identifying Energy Solutions that Finance Themselves
AECOM joint venture awarded US$285.8-million contract by Thames Water
Understanding the True Cost of Water
HDR Expert Authors New Book On Activated Sludge Technologies
Brown & Caldwell Wins Award for Seattle Water Project
Aging Water Infrastructure: From Out of Sight to Top of Mind
Developing Procurement Documents for Progressive DB Projects
Project Spotlight: Charnock Well Field Restoration
'Value of Water' Campaign Aims to Educate the Public
Project Spotlight: Augusta, Georgia Wastewater Treatment Plant
Project Spotlight: U.S. Navy Wastewater Treatment Plant Upgrade
Subscribe to Email Updates
Posts by Topic
design-build
(60)
Collaborative Project Delivery
(46)
CH2M Hill
(24)
WDBC Admin
(23)
Black & Veatch
(20)
water design-build project
(20)
CMAR
(19)
Haskell
(10)
Water Infrastructure
(9)
risk allocation
(8)
Brown and Caldwell
(7)
Wastewater Infrastructure
(7)
progressive design-build
(7)
CDM Smith
(5)
Education
(5)
HDR
(5)
best practices
(5)
AECOM
(4)
Owners
(4)
Parsons
(4)
Arcadis
(3)
Carollo
(3)
Wastewater Treatment
(3)
procurement
(2)
ACEC
(1)
Burns & McDonnell
(1)
CWSRF
(1)
Construction Law
(1)
Value of Water Coalition
(1)
Water Week
(1)
craft labor
(1)
fixed-price design-build
(1)
municipal water
(1)
new york
(1)
safety
(1)
wastewater
(1)
see all