Owners often look to design-build delivery as a means to accelerate the overall schedule for their water or wastewater project. In fact, schedule advantage was cited as the #1 reason for selecting design-build delivery in a recent survey of owners conducted by the UNLV and Water Design-Build Council.
Bryan Bedell, DBIA, Haskell Water Division Leader
As the leader of Haskell’s Water Division, Bryan is responsible for project oversight, profit and loss, development of opportunities, strategic partnerships, and teaming. He oversees projects from inception through to completion while maintaining a high level of client interaction to ensure satisfaction with the project. As a design-builder with close to 20 years of experience in all aspects of project delivery, Bryan is able to bridge the needs and requirements of his clients, planners, design engineers, constructors and operators, ensuring that all stakeholders collaboratively develop excellent solutions. He serves as the First Vice President/Treasurer to the WDBC Board of Directors.
Recent Posts
Utilizing Design-Build Delivery to Provide Water Treatment Solutions on a Deadline
Posted by
Bryan Bedell, DBIA, Haskell Water Division Leader on Fri, Jan 12, 2018 @ 11:00 AM
0 Comments Click here to read/write comments
Topics: design-build
Haskell Spotlight: St. Marys Wastewater Treatment Plant Expansion
Posted by
Bryan Bedell, DBIA, Haskell Water Division Leader on Fri, Aug 14, 2015 @ 01:07 PM
Located in the City of St. Mary’s, Georgia, the Point Peter Wastewater Treatment Plant was consistently experiencing flows of 1.2 mgd and exceeded the capacity and 0.9 mgd discharge limits of its operating permit, primarily due to unanticipated development in the area.
0 Comments Click here to read/write comments
Topics: Haskell, CMAR, Wastewater Treatment